A feasibility study is two to three weeks of work before you commit to a site. We read the planning rules, walk the land, and sketch what could realistically be built there.
You get three things: how much floor area the rules allow, a rough budget range for building it, and an honest estimate of how long the permit will take.
Most of the clients who commission one either buy with confidence or walk away from a plot that would have cost them two years.